On 21.10.2010 12:29, Dr Andrew John Hughes wrote:
> OpenJDK b21 should be available sometime in the next month or so. I'd
> like us to release IcedTea6 1.10 about a week after, allowing time for
> testing, etc.
>
> With the change to HotSpot 19 as default (added on Tuesday), current
> IcedTea6 HEAD is now pretty much inline with b21, through this and our
> other patches. So the b21 bump will be just a matter of switching to
> the new tarball. You can track progress on b21 using the hg branch:
> http://icedtea.classpath.org/hg/icedtea6-hg.
>
> Major changes in 1.10:
>
> * Upgrade to HotSpot 19 (on HEAD) and OpenJDK6 b21 (imminent)
which fails to build on powerpc. looks like an upstream issue. see icedtea#579.
Matthias