Fwd: RE: Verona (JEP 223) Integration to JDK 9

dalibor topic dalibor.topic at oracle.com
Mon Dec 7 12:04:05 UTC 2015


Hi packagers,

with the latest JDK 9 build (b95) the version string used by the JDK has 
changed. If you are packaging your own JDK 9 Early Access builds, please 
take note of the forwarded message.

cheers,
dalibor topic


-------- Forwarded Message --------
Subject: RE: Verona (JEP 223) Integration to JDK 9
Date: Wed, 2 Dec 2015 21:14:27 -0800 (PST)
From: Iris Clark <iris.clark at oracle.com>
To: jdk9-dev at openjdk.java.net
CC: verona-dev at openjdk.java.net

Hi.

I'm thrilled to report that the Verona integration to jdk9/jdk9 is complete.
The changes have been sync'd down to jdk9/dev and jdk9/client.  Sync to
Other dependent forests is forthcoming.  JDK 9 build 95 has been promoted
and tagged using the new tag format, "jdk-9+95".

Additional work still needs to be done before we can declare Verona
complete, but the largest, highest impact changes are now in the JDK 9
release forest.

Thanks,
Iris

P.S.  If you have a local copy of jcheck.py [0], please update to the
latest version which was modified to accept the new tag format.

[0] http://hg.openjdk.java.net/code-tools/jcheck

-----Original Message-----
From: Iris Clark
Sent: Tuesday, November 24, 2015 11:41 AM
To: jdk9-dev at openjdk.java.net
Cc: Iris Clark; verona-dev at openjdk.java.net
Subject: Verona (JEP 223) Integration to JDK 9

Hi.

Implementation of the new version-string scheme for OpenJDK (JEP 223 
[0]) is nearly complete and we are almost ready to push verona/stage [1] 
into the JDK 9 release.

The changes for Verona were primarily in the build system and the jdk 
and hotspot repositories to support the modified system properties. 
Most notably, "java.version" now returns "9" instead of "1.9.0". 
Additional changes were also needed in a small number of regression tests.

The most common problem we've discovered is that applications that 
detect the version number may include code which assumes that the 
version string begins with "1." or that there is always a '.' in the 
version string.

As you may recall, we've been using this forest to stage all Reviewed 
changesets.  Now that we are ready to integrate we will use build 95 to 
integrate all the Project Verona changes as an isolated integration.  Other
jdk9/* development forests will continue to accumulate changesets for an 
additional week.

Here's the anticipated time line:

     Thu 26 Nov [ US Thanksgiving ]
         - jdk9/jdk9 (MASTER) build 94 promotion

     On or before Mon 30 Nov
         - Sync verona/stage with jdk9/jdk9 MASTER (build 94)

     Tues 1 Dec
         - Integrate verona/stage to jdk9/jdk9 (MASTER)

     Wed 2 Dec
         - jdk9/jdk9 build 95 promotion (with Verona)
         - After promotion, sync down to jdk9/dev and other dependent 
forests

All remaining Verona changes will be pushed to a standard JDK 9 
development forest (e.g. jdk9/dev or jdk9/client).  The regular 
integration and promotion schedule will resume with build 96 the week of 
7 Dec.

Thanks,
iris

[0] http://openjdk.java.net/jeps/223
[1] http://hg.openjdk.java.net/verona/stage




More information about the distro-pkg-dev mailing list