[FREEZE] 11.0.3 NOW FROZEN

Aleksey Shipilev shade at redhat.com
Tue Apr 2 08:00:25 UTC 2019


On 4/2/19 3:22 AM, Andrew John Hughes wrote:
> There are two changes in the repository after 11.0.3+5 [1] [2]. These
> changes were not committed until after the agreed deadline of the 1st
> and so will now have to wait until 11.0.4.

That would be very confusing, as [1] is recorded to be in 11.0.3 in JIRA now, in addition to being
in repository history as between 11.0.3+5 and 11.0.3+6. Either revert the patches after 11.0.3+5 and
let us push to 11.0.4, or pull the patches into 11.0.3 CPU.

> I suggest that, in future, we aim to tag the release on the day of the
> deadline or the last working day before to avoid such confusion.

I suggest, once again, that we mechanically lock the repository when we don't accept the pushes. Let
only the maintainers to push. Then Andrew can push the CPU update himself before unfreezing the repo.

> [0] https://hg.openjdk.java.net/jdk-updates/jdk11u/rev/dd4470fa81fe
> [1] https://hg.openjdk.java.net/jdk-updates/jdk11u/rev/a68aa56930c0
> [2] https://hg.openjdk.java.net/jdk-updates/jdk11u/rev/22cfec306339


-- 
Thanks,
-Aleksey