RFR: Upstream merge 2018-06-06
Roman Kennke
rkennke at redhat.com
Wed Jun 6 10:12:38 UTC 2018
Another day, another batch of stuff from upstream (I'm catching up. slowly.)
This time up to:
changeset: 50515:d9bc8557ae16
user: pliden
date: Fri May 18 15:21:23 2018 +0200
summary: 8202989: Add missing decorators in calls to to
arraycopy_prologue/epilogue
Next one up will be C2 barriers modularization, which I'll take
single-step again. The merge also includes a cherry-pick:
changeset: 50517:3ddd12a7e829
tag: tip
user: iignatyev
date: Fri May 18 12:45:05 2018 -0700
summary: Cherry-pick: 8203437: 8199370 broke build on linux-ppc64le
(w/ GCC 4.8.5.)
Otherwise I can't run any tests.
Most stuff was trivial. The only thing to watch out for are some
ReferenceProcessor changes which basically eliminates the separate
enqueue phase. We shall have a close look if it possibly breaks stuff.
What I've seen so far looks ok.
Testing: tier3_gc_shenandoah ongoing, but looks ok. must finish clean
before pushing.
http://cr.openjdk.java.net/~rkennke/upstream-merge-2018-06-06/outgoing.txt
Ok?
Roman
More information about the shenandoah-dev
mailing list