preparing an IcedTea6-1.8 release

Andrew John Hughes ahughes at redhat.com
Tue Mar 9 09:44:13 PST 2010


On 9 March 2010 17:39, Matthias Klose <doko at ubuntu.com> wrote:
> Hi,
>
> I would like to prepare an IcedTea6-1.8 release, which I would like to
> include into the coming Debian and Ubuntu releases. The build failures
> introduced with the 6b18 import are now fixed, not seeing any more build
> failures. Would be reasonable to do this before switching to 6b19, and
> preparing a prerelease for mid/end of next week, and the final release for
> the end of March?
>
>  Matthias
>
>

We definitely need a release prior to importing b19, but that's not
imminent just yet (Zero needs upstreaming for one thing).  It would
also be good to get Nimbus out in a release, so the plan sounds good
to me.
-- 
Andrew :-)

Free Java Software Engineer
Red Hat, Inc. (http://www.redhat.com)

Support Free Java!
Contribute to GNU Classpath and the OpenJDK
http://www.gnu.org/software/classpath
http://openjdk.java.net

PGP Key: 94EFD9D8 (http://subkeys.pgp.net)
Fingerprint: F8EF F1EA 401E 2E60 15FA  7927 142C 2591 94EF D9D8



More information about the distro-pkg-dev mailing list